600mm 50t Hydraulic Rising Bollard BS-SY602R-406

304 stainless steel hydraulic rising bollard with 600mm raised height, 150mm/s movement, 50-ton passing load, warning light and backup-powered lowering.

Category:

Description

Direct Answer

BS-SY602R-406 is an IP68 hydraulic rising bollard for high-security vehicle access projects. BAISEN recommends a 6mm wall thickness for this model’s 1.2m column assembly. Control components can be factory pre-wired to the confirmed project configuration for faster site commissioning. Each export order is prepared with reinforced wooden-crate protection to reduce handling damage during international delivery.

Product Name: 22T Hydraulic Single 升降柱 (Lifting Column)

 

Functional Features
● Warning Light: There is a warning light strip on the top of the column. The light strip lights up when the column is lifting or lowering, and the warning light for the ascending and descending status of the column is obvious;
● Lifting Speed: 150mm/s;
● Warning Sign: 5cm reflective tape, with night warning function;
● Installation Environment: Install according to the site environment and geological conditions;
● Passing Pressure: 50-ton container truck;
● Height after Rising: 600mm standard (±2mm);
● Control Mode: Control cabinet button control, three-button console remote control (standard), lighting control (optional);
● Operating Temperature: -20°C to 55°C;
● Lifting Method in Case of Power Failure: The backup power supply controls the solenoid valve to lower;
● Lifter: The lifting column can lift and lower continuously for 5000 times without failure, and the lifter lifts and lowers accurately;
● Water Immersion Performance: The lifting column is immersed in water for more than 72 hours, with no leakage, and can lift and lower normally;
● Control System: The dielectric strength, insulation resistance, and current discharge of the control system comply with the provisions of item 5.7 in GA/T 1343-2016.

 

Technical Parameters
● Input Voltage: AC220V ±10%
● Column Material: 304 stainless steel
● Column Diameter: Φ219mm (±0.5mm)
● Driving Mode: Independent integrated hydraulic system
● Protection Level: IP68
● Recommended Wall Thickness: 6mm (±0.5mm) for the 1.2m column assembly
● Motor Power: 300W (input power 1200W)
● Lifting Force: 200Kg
● Lifting Speed: 150mm/s
● Warning Sign: 5CM reflective tape, with night warning function
● Control Cabinet Mode: 1 drag 6, 1 drag 3

Installation Support

Automatic Hydraulic Bollard Technical FAQ

Foundation, drainage and field-wiring guidance for system integrators and installation contractors.

What foundation and civil work are required for installing automatic hydraulic bollards?

For this automatic hydraulic bollard, prepare a foundation pit approximately 800mm wide and 1300mm deep, including a 200mm compacted foundation or drainage layer. After positioning and levelling the bollard, secure and backfill the surrounding area, then cast the upper 300mm with C25-grade concrete or higher. Finish the bollard flange 3-5mm above the surrounding ground and confirm final civil dimensions against the approved model drawing and site conditions.

How do you handle drainage in areas with heavy rain or high groundwater?

Drainage must be selected according to the site survey. Natural seepage uses a compacted crushed-stone and sand layer beneath the bollard, with a 50mm PVC elbow directing water into the drainage layer. Where suitable, the bottom 50mm PVC outlet may connect to the approved stormwater network. For low-lying, flood-prone or poorly drained sites, install a separate collection sump with an automatic submersible pump and discharge it to an approved drain or landscaped area.

Are the electrical cables difficult to wire on-site?

No. The bollard uses a prepared external junction box so site contractors do not need to wire inside the bollard casing. The installation manual specifies one 3-core 2.5mm² motor cable. The LED and solenoid-valve signal cable is 4-core 1.0mm². All cable joints must receive proper waterproof insulation before being routed through conduit to the control cabinet.

Pre-Installation Checklist

Engineering Site Survey & Buyer’s Guide

Review these civil, drainage and electrical requirements before confirming the bollard configuration, control cabinet position and installation plan.

Step 1: Civil Pit & Drainage Survey

Verify the groundwater level and choose between natural seepage, a municipal drainage outlet, or an automatic sump pump system. For this automatic hydraulic bollard, prepare an installation pit approximately 800mm wide and 1300mm deep, including an approximately 200mm foundation and drainage layer.

Step 2: Electrical & Cable Trenching

Route one 3-core 2.5mm² motor power cable and one 4-core 1.0mm² LED/solenoid-valve signal cable directly from the installation pit to the PLC control cabinet.

Step 3: Foundation Concrete Standard

Prepare the approximately 200mm foundation and drainage layer, position and level the bollard casing, and complete the upper approximately 300mm section with C25-grade concrete or higher. Keep the finished bollard flange approximately 3–5mm above the surrounding surface to reduce dust and surface-water accumulation.

Engineering note: Final pit dimensions, drainage design and cable routing must be verified against the approved project drawing and local site conditions before construction begins.

Project Quote Chat with Engineering Sales